HIGH QUALITY IS KING

JCD Scaffolding Formwork Water Stop System
JCD Scaffolding Formwork Water Stop System
JCD Scaffolding Formwork Water Stop System
1.The Material is QT450-10
2.The Craft is Sand Casting
3.The Size is D15
4.The Relation products is Tie Rod
5.The Weight is 0.25-0.8KG
6.The Surface treatment is Plain and Galv and HDG
7.The Packing way is Bag and plywood cases
8.The Delivery time is 25days
9.The Payment way is 30% T/T in advance .
10.We can custom-made according to your required.

Product details

1.The Material of Scaffolding Formwork Water Stop is QT450-10 

2.The Craft of Scaffolding Formwork Water Stop is Sand Casting 

3.The Size of Scaffolding Formwork Water Stop is D15 

4.The Relation products of Scaffolding Formwork Water Stop is Tie Rod 

5.The Weight of Scaffolding Formwork Water Stop is 0.25-0.8KG 

6.The Surface treatment of Scaffolding Formwork Water Stop is Plain and Galv and HDG 

7.The Packing way of Scaffolding Formwork Water Stop is Bag and plywood cases 

8.The Delivery time of Scaffolding Formwork Water Stop is 25days 

9.The Payment way of Scaffolding Formwork Water Stop is 30% T/T in advance . 

10.We can custom-made according to your required.

cutter suction dredger